Projects & installations

VIA Rail — railway bridge approaches (project 1)

VIA Rail — railway bridge approaches (project 1)

Brush growing at the approaches of railway bridges creates fire hazards, blocks inspections and drives up maintenance. BioBarrier was laid over the prepared subgrade before the ballast went back in, stopping regrowth at the source and keeping the structure visible and safe.

← Back to the product page

Need a recommendation for your project?

Tell us about the site conditions and we will point you to the right product.

Request information